Highway, Road & Bridge


East Coast Expressway, Bridge Package (Phase II),
Terengganu


Client: MTD Capital Berhad / Terratech Consultants(M) Sdn Bhd

Structural & Geotechnical Design for 12 nos of bridge packages (Road and River Crossings) along the 60 km Stretch of the Proposed East Coast Expressway Phase 2 including The Spur Road in Terengganu.




KESAS-Bandar Puteri 'Diamond Interchange',
Bandar Puteri Klang, Selangor


Client: Malayanpine Estates Sdn Bhd

The lifeline to Bandar Puteri, KESAS interchange and its road networks promoting safe and convenient traffic flow to its residents and has since contributed significantly to the success of Bandar Puteri development and the surrounding matured township.




Federal Route upgrading: Alor Gajah-Muar (Package 1) ,
Melaka, Malaysia


Client: C&H Engineering Consultants Sdn Bhd

Part of the nation?s road upgrading program: The upgrading to R5 type FR2 Alor Gajah ? Muar federal road to a major urban alternative link. Our Designer utilized the MOSS Road Design Software to produce the most optimized design resulting in cost and time advantages to the Public Works Department, the Client.




Trumpet Interchange for 'Park-n-Ride' Facility,
Precinct 13, Putrajaya


Client: Perbadanan Putrajaya

The purposed built underpass interchange for the Park-n-Ride Facility in Presint 13, Putrajaya for Perbadanan Putrajaya. The facility comprises of 1500 Parking bays, Hotel and Bus Terminal. The interchange include ?jack-in?twin Culvert? through existing road. Tender exercise completed.




Interchange at South Klang Valley Expressway to IOI Resort,
Putrajaya


Client: IOI Corporation Berhad

The purposed built underpass interchange for the Palm Garden Resort from the South Klang Valley Expressway (SKVE) had be conceptual using a 3 span bridge to completely elevate a total of 8 lands of the highway provide the resort with a direct access from the highway.




Bridge Linking Putrajaya Sentral to B15 and Over Express Rail Link (ERL), Precinct 7, Putrajaya

Client: Perbadanan Putrajaya

Designed as a balanced cantilevered boxed-girder construction, the launching of the bridge deck was carried out within limited period over the life and commissioned ERL electrified tracks.

Collaborated effort among team members has resulted in successful launching over a shortest possible period with no disruption to the service at all. Construction cost has been regarded as the most competitive.




Bridge 3 & 5 over ERL Tracks,
Precinct 5, Putrajaya


Client: Perbadanan Putrajaya

Bridge 3 and 5 links Putrajaya Presint 5 to Presint 20 and to Taman Selatan respectively. The bridges were designed within constraints of the ERL tracks reserve, vertical profile and unfavorable sub-surface geotechnical conditions.




strong>East-West Highway (II): Simpang Pulai-Cameron Highlands-Gua Musang-Kenyir Road: Package 5; Chiku to Aring, Kelantan

Client: TH Technologies - HCM

AS part of the 2nd East-West Highway, the road serves as an alternative link to the East Coast States of the Peninsular Malaysia, traversing through a scenic route of Cameron Highlands to Kenyir Lake in Terengganu. The 26km new road was designed to a modified R4 with massive undulating and hilly terrain. Our Designer utilized MOSS Road Design Software design optimization resulting in cost and time advantages to the Public Works Department, the Client.




Spine Road Linking Precinct 7 to Presint 8,
Putrajaya


Client: Perbadanan Putrajaya

The Spine Road was designed and built within short period in time for the commissioning of Perdana Leadership Foundation in Presint 7. Flexible enough to accommodate future expansion to full scale road and junctions. Design and built to incorporate th emonorel bridge and the signature Seri Saujana Bridge abutment and underpass.