Elevated 0.5 MG,Taman Tiara Perdana,
Simpang Renggam, Johor
Client: Syarikat Perumahan Negara Berhad
Designed to cater both current and future demands of the development, considering the technical & economic factors, this elevated storage water resevior had been adopted.
In designing such water storage facilities are engineering customize each design to access storage volume, height, and water pressure requirement to achieve a balance design.
Precast RC piles had been adopted as the foundation system due to geotechnical design consideration. The structures are performed as designed.
Elevated 0.75 MG each,
Bukit Beruntung, Selangor
Client: Noble Rights Sdn Bhd
Elevated storage tanks are basic requirement for all development in Malaysia to meet the required Water Storage Demand specified by the relevant authority. In designing such water storage facilities are engineering customize each design to access storage volume, height, and water pressure and foundation requirement to achieve a balance design.
2 MG Reservoir on elevated ground,
Subang Jaya, Selangor
Client: Sime UEP Development Sdn Bhd
Elevated storage tanks are basic requirement for all development in Malaysia to meet the required Water Storage Demand specified by the relevant authority. In designing such water storage facilities are engineering customize each design to access storage volume, height, and water pressure and foundation requirement to achieve a balance design.
0.8 MG Elevated Resevoir,
Desiran Melawati, Kuala Lumpur
Client: NBC Group
Elevated storage tanks are basic requirement for all development in Malaysia to meet the required Water Storage Demand specified by the relevant authority. In designing such water storage facilities are engineering customize each design to access storage volume, height, and water pressure and foundation requirement to achieve a balance design.
0.9 MG Reservoir,
Taman Saujana Puchong, Selangor
Client: Expand Factor Sdn Bhd
Elevated storage tanks are basic requirement for all development in Malaysia to meet the required Water Storage Demand specified by the relevant authority. In designing such water storage facilities are engineering customize each design to access storage volume, height, and water pressure and foundation requirement to achieve a balance design.
36,000 PE (SBR System) in Nice Frontier,
Johor Bahru
Client: Nice Frontier Sdn Bhd
Sewerage Treatment Plant (STP), of which requires effluent to exceed the Class 'A' utilities Treatment process, had been designed in various urban and residential developments. The popular system; SBR (Sequential Betch Reactor System) had be specified and designed in collaboration wit the specialist contractor mechanical system input. The low-maintenance system to date has the ability to process high influent to meet the environmental requirement. To date, all STPs specified by us performed as designed.
8,200 PE Sewerage Treatment Plant,
Bandar Putera, Klang, Selangor
Sewerage Treatment Plant (STP), of which requires effluent to exceed the Class 'A' utilities Treatment process, had been designed in various urban and residential developments. The popular system; SBR (Sequential Betch Reactor System) had be specified and designed in collaboration wit the specialist contractor mechanical system input. The low-maintenance system to date has the ability to process high influent to meet the environmental requirement. To date, all STPs specified by us performed as designed.
4,800 PE Amazing Achievements,
Klang, Selangor
Client: Amazing Archievement Sdn Bhd
Sewerage Treatment Plant (STP), of which requires effluent to exceed the Class 'A' utilities Treatment process, had been designed in various urban and residential developments. The popular system; SBR (Sequential Betch Reactor System) had be specified and designed in collaboration wit the specialist contractor mechanical system input. The low-maintenance system to date has the ability to process high influent to meet the environmental requirement. To date, all STPs specified by us performed as designed.