Bridge 3 & 5 over ERL Tracks.

Bridge 3 and 5 links Putrajaya Presint 5 to Presint 20 and to Taman Selatan respectively. The bridges were designed within constraints of the ERL tracks reserve, vertical profile and unfavorable sub-surface geotechnical conditions.

Client

Perbadanan Putrajaya

Location

Precinct 5, Putrajaya